News from Dewa Sanzan Shrine
News of the Gassan pair lift commercial operation resumption
2014-07-16
The Gassan pair lift that Gassan tourism development runs lasts for a long term for prop repair construction, and commercial operation was stopped, but all construction is completed and are done resumption of operation from 8:00 a.m. on Wednesday, July 16.
In addition, it becomes the commercial operation from 7:30 on a festival day on Saturday and Sunday.
Please refer to Gassan tourism development (0237-75-2025) for the detailed contents.